Market for MW-scale PV O&M and asset management to surpass 133 GW worldwide by end-2015

A November 2015 GTM Research report expected the global fleet served by MW-scale PV O&M and asset management to pass 133 GW in 2015 and exceed 488 GW by 2020.

Line illustration for Renewable Energy

In November 2015 GTM Research published Megawatt-Scale PV O&M and Asset Management 2015–2020, a report on the companies that run and manage large solar plants after they are built. Its headline forecast, publicised in early 2016, was that the global fleet served by this market would exceed 133 GW by the end of 2015 and more than triple to over 488 GW by 2020. The numbers describe a shift in the solar business: once plants are built, someone has to keep them producing, and someone has to manage them as financial assets for 20 years or more.

What the report said

According to GTM’s report listing, written by consultant Cedric Brehaut:

  • The total market for megawatt-scale O&M and asset management was expected to surpass 133 GW worldwide by end-2015.
  • It was forecast to exceed 488 GW by 2020, driven mainly by China, the United States, India and Japan.
  • The 189-page report profiled 57 vendors, covering their services, in-sourcing or out-sourcing policies, and fleet size by country.
  • It covered 15 markets: Brazil, Canada, Chile, China, France, Germany, India, Italy, Japan, Mexico, South Africa, Spain, Thailand, the United Kingdom and the United States.
  • GTM later updated the forecast to reflect the extension of the US investment tax credit at the end of 2015.

The “133 GW” figure is therefore a measure of the installed capacity that needs these services, not of money spent on them or of new solar installed in 2015. The report was sold commercially, so only the summary figures were public.

What “MW-scale” means

The market covered plants of roughly 1 MW and above: ground-mounted solar farms and large commercial rooftops. Residential systems and small commercial installations, which are usually maintained by installers or owners on an ad hoc basis, were outside the scope.

For context, IEA PVPS estimated that at least 177 GW of PV was installed worldwide by the end of 2014, and Fraunhofer ISE later put the global total at about 242 GWp by the end of 2015. A 133 GW MW-scale fleet would therefore have been a little over half of the world’s PV capacity:

133 GW / 242 GW ≈ 0.55

Because the sources used different definitions and data sets, that ratio is only indicative.

O&M and asset management: the difference

The two services are often bought together but answer different questions.

Service Main question Typical tasks
Operations and maintenance (O&M) Is the plant producing what it should? Remote monitoring, preventive inspections, module cleaning, vegetation control, inverter servicing, corrective repairs, spare-parts management, thermographic surveys
Asset management (AM) Is the plant earning what it should? Revenue and contract management, reporting to investors and lenders, regulatory compliance, insurance, warranty claims, budgeting, oversight of the O&M contractor

The engineering measure most O&M contracts revolve around is the performance ratio (PR): the energy a plant actually delivers divided by what it would deliver if it converted the measured sunlight at its nameplate efficiency with no losses.

PR = E_actual / (H_poa × P_STC / G_STC)

where E_actual is measured AC energy (kWh), H_poa is plane-of-array irradiation (kWh/m²), P_STC is the array’s rated power (kWp) and G_STC is 1 kW/m². Fraunhofer ISE reported that typical performance ratios had risen from about 70% before 2000 to 80–90% by 2016. On a large plant, each percentage point of PR is a measurable amount of revenue, which is why monitoring and fast repairs became a competitive business.

How fast the forecast implied the market would grow

GTM’s two numbers imply a steep compound growth rate:

Growth factor 2015–2020 = 488 / 133 ≈ 3.67
Annual growth rate      = 3.67^(1/5) − 1 ≈ 0.30, or about 30% per year

That growth was expected to come largely from new utility-scale construction in China, the US, India and Japan, each with large project pipelines at the time.

Why it mattered

In early 2016 the size of this market was a sign that solar had matured into infrastructure. Plants were being refinanced and traded, and investors wanted independent assurance that output and revenue matched the original financial models. It also raised the stakes on quality: defects that slipped through factory inspection, of the kind described in our restored article on poorly made PV modules, became recurring O&M costs. For countries planning their first large-scale solar programmes, including Malaysia (see Malaysia to install 1,250 MW of solar PV by 2020), long-term operation was becoming as important a design consideration as construction.

What has changed since

Malaysia’s first large-scale solar tender, run by the Energy Commission in 2016, produced its results in early January 2017. Trade press reported more than 450 MW selected against the 250 MW originally tendered, with projects in Peninsular Malaysia and Sabah targeted for commercial operation in 2017–2018. Each of those plants fell squarely within the MW-scale category GTM had analysed, creating a domestic market for O&M and asset management services. The wider growth of the world PV fleet is described in our restored report on the 177 GW global milestone for 2014.

Sources and further reading

  1. Megawatt-Scale PV O&M and Asset Management 2015-2020: Services, Markets and Competitors (Cedric Brehaut, November 2015, archived report page), GTM Research
  2. Snapshot of Global PV Markets 2014 (Report IEA PVPS T1-26:2015), IEA Photovoltaic Power Systems Programme
  3. Photovoltaics Report, updated 17 November 2016 (archived copy), Fraunhofer ISE
  4. Malaysia Awards Over 450 MW PV Capacity (3 January 2017), TaiyangNews